Tuesday, December 30, 2008

Mini-Project 02_ Part 2 (15%)

Dear Students

For this section Part 2 of the Mini-Project 02, you will need to complete the following (with reference to Part 1):

1. Give Part Number & Description to each of your component
2. Indicate the processes such as assembly or machining
3. and complete the "Material Master Data"

You may get more details on the "Material Master Data" from the following:

http://sapmmhelp.blogspot.com/2008/09/master-data-master-data-contains.html

and for the "MRP Group"

it is either the code 0040 (internally purchased) and 0010 (externally purchased).
You will need to decide frommyour BOM listing which items are internally or externally purchased.

Hope this helps.

Monday, December 29, 2008

Class Allocation For next Tues (06 Jan 2009)

Dear Students from class (GEMM010BFT01),

As next week we will be going for the SAP hands-on on the BOM (Bill of Material)
the following groups will be allocated to the following classes:

Class T1824 (to be taken By Mr Yap Chin Hooi)
- DAC
- BC
- Pink Dolphin
- Complicated

Class W1115 (to be taken by Madam Keh Poh Tin)
- Toblerone
- 3-short-1
- Anything
- LSW
- CONNOISSEUR

Sunday, December 28, 2008

Submission of Report & Presentation

Part 1 (10%)

1. Form in a group of 4
2. Design a simple product
3. Sketch a 3 D view (freehand or using autocad) to show the different parts of the product (Other views may be included for clearer illustration)
4. Draw a product structure tree with minimum of 3 levels
5. Present your product and product structure tree and indicate the basis included for the BOM you have developed

Sunday, November 30, 2008

Mini-Project02

Here is the download to the mini-project02
which is due after the term break.

http://www.mediafire.com/?hm2lmm2ma0y

Wednesday, November 5, 2008

Aftermath of the Presentation and Results

I was impressed with your presentation and the teamwork that you guys have.
I am very sure that you all must have had a better understanding of the ERP, from Inventory Management to Human Resource.
As you may notice that froms ome of the readings and research work that
you all have conducted you will notice that the various modules in the ERP are in some ways connected to each other.

Here are someinformation on the grades:

For GE/MM010B/FT/01 class:
Average Marks = 80, Max marks = 91 and Minimum marks = 73.

For GE/MM0101B/FT/02 class:
Average Marks = 75, Max marks = 85 and Minimum marks = 65. (and there is one group who did not completely submit the report)

Lastly, I hope to see more of your presentation skills in the Mini-project 02.

Monday, October 20, 2008

Mini-Project 01 (20%)

Based on the worksheet provided to students this week, please take note of the following:

1. For those who have absent themselves please note that I have distributed the Mini-Project 01 out.
2) By week 4 students are to submit a report (about 800 to 1000 words) and put up a 10 minutes presentation for each team.
3) Marks will be allocated based on:
- Group report
- Presentation materials
- Presentation oral.